Customer: Energy (Biomass Power Generation) Asset: 7.5 MW Steam Turbine and gearbox assembly (GTA) Location: Monthyon, France Initial Condition & Challenge No clear fault detected under
Machine & Event Overview Two identical GE 5002 32MW Gas Turbines, IGC 15 and IGC 16, were operating under similar conditions. Operational concerns were raised
Machine & Event Overview At a 12MW Groupe Turbo-Alternateur steam turbine installation in Suez, the equipment was experiencing occasional unexplained trips during operation. The issue
Customer: Industrial energy production facility, Toulouse Asset: 7 MW Siemens Turbine and gearbox assembly (GTA) Industry: Energy recovery / industrial turbine systems Installation & Monitoring
Customer: Energy Biomass Power Generation Asset: 7.5 MW MAN DIESEL and TURBO Steam Turbine and gearbox assembly (GTA) Location: Orleans, France The Situation Initial Observation: